Architect: Chadwick Dryer
Build Cost: £370k
Manufacturers: Vitra, bof
Following a competitive tender process bof were appointed to work alongside Architects Chadwick Dryer to create an exciting scheme at the University of Bedfordshire's new Postgraduate and CPD centre, based at the University's Luton Campus.
To complement the interior design of the new building, we featured a large range of furniture with a high aesthetic quality. Featuring furniture from Vitra, Brunner and our very own Harmony Collection, we achieved a sophisticated and sleek aesthetic throughout the buildin
Mark Clarke - Director. Chadwick Dryer Clarke Studio
We aimed to create a flexible space to be used by both teachers and students. The use of technology within the building was very important to the University, so where possible we supplied furniture with technology in mind. The aim was to ensure power and data were easily accessible in key areas of the building.